US 6 Resurfacing and Safety Improvements

Project Type

CDOT

Highway

General Contractor: APC Construction Co.
Subcontractors or Key Contractors:

  • Cruz Construction
  • Legacy Traffic Control
  • American Striping
  • Kinetic Energy

Materials Used on Project:

  • Class 6 ABC – 13,690 tons
  • HMA – 42,425 tons

This project consisted of shoulder widening, milling, and asphalt overlay. In addition, over 33,000 LF of guardrail was removed and replaced to bring up to new standards. 127 clean culverts and various concrete box culverts and headwall repairs. Also, some minor rock scaling, rock bolt installation, and multiple environmental protection devices were placed.

“This has been a very challenging project due to the location and narrowness of the roadway.”

Keary Brown, Project Manager

APC Construction